Analysing the Key Points for Cost Control of EPC Model Hospital Construction Project

VIEWS - 154 (摘要) 90 (PDF (English))
Nayan Bu

摘要


As the EPC (Engineering Procurement Construction) model became one of the widely used models in the areas of local and international construction, project management based on the EPC highlights its importance. EPC project commonly refers to the four stages of the project implementation process which are design, procurement, construction and delivery to a construction enterprise for integrated management.The advantage is that it can unleash the leading role of the design by overall optimization in the implementation of the project to realize reasonable cross and full coordination in the various stages of design, procurement and construction, achieving savings in investments as desired by the owners, shorten the construction period, improve the quality and other targets.


关键词


Hospital construction; EPC Project; Cost control

全文:

PDF (English)


DOI: http://dx.doi.org/10.18686/wc.v5i1.71

Refbacks

  • 当前没有refback。


Creative Commons License
此作品已接受知识共享署名-非商业性使用 4.0国际许可协议的许可。

 

世界建筑是同行评审的开放获取期刊。所有期刊内容,除非另有说明,都是根据  知识共享署名 - 非商业性使用国际授权4.0许可的